Which California Towns Require Story Pole Certification? A Table of Who Signs and When

The short answer

Most California towns that require story poles also require a story pole certification form, letter or stamped plan from a licensed professional confirming the poles match the approved plan. Who may sign and when it is due differ by town. Some accept only a licensed land surveyor or a surveying civil engineer, others accept an architect or contractor, and deadlines run from “within five days of installation” to “three weeks before the hearing.” The table below covers the 13 jurisdictions we work in most, as of September 2026.

What Is on a Story Pole Certification Form, Town by Town

TownCertification required?Who may signFormatWhen
HillsboroughYesLicensed surveyor or civil engineer (architect not accepted)Letter with stamp, signature and approved plan attachedWithin 5 days of installation; submitted no later than 5 days before the hearing
Los Altos HillsStaff inspection; surveyor or civil engineer sets perimeter points; photosProject surveyor or civil engineer for layoutPhotographs to staffBefore public notice
Los Altos (City)Per City specifications `[CONFIRM]`Poles up 20 days before hearing
Los GatosYesLicensed surveyor or civil engineerWritten verification of height and position of poles and nettingBefore neighborhood notification, with photos
Monte SerenoYesCalifornia registered land surveyor (form also names a civil engineer)City’s Story Pole Certification Form, stamped and signedTwo weeks before the hearing
Mill ValleyYesLicensed land surveyorCertifying document to Planning and BuildingWith the poles, 10 days before the hearing
TiburonYes (carry out or certify)Surveyor, engineer, architect, landscape architect or contractorCertification to the TownBefore the Design Review Board meeting (Town of Tiburon, checklist)
BurbankYesLicensed architect, engineer or surveyorStory Poles Affidavit under penalty of perjury, plus photos from 3 vantage pointsBefore public noticing; planner verifies and visits
CalabasasYesLicensed contractor, surveyor, architect or civil engineerWritten certification with the planThree weeks before the first hearing
Laguna BeachYesRegistered land surveyor or civil engineer licensed to surveyCertification of location and height (stamp on the staking plan)At least 21 calendar days before the first hearing
MalibuYes, for new homes, new commercial, primary-view and scenic-area projectsLicensed surveyor, civil engineer or architect (surveyor follow-up if challenged)Certification to the case planner, then planner site visitBefore public notification (City of Malibu, policy manual)
Pacific Palisades (City of LA)Per HOAPer HOAPer HOAPer HOA
Santa Barbara (City)YesSurveyor, engineer, architect, landscape architect or contractorSigned certification letter with address, APN, PLN number and required statementAfter installation, before removal
Santa Barbara County (Montecito, Hope Ranch)YesThe licensed professional who prepared the plan or installed the polesCertification to staffAfter installation, before Board review

Owners, applicants, relatives and anyone with a financial interest may never certify; Laguna Beach, Malibu and Burbank state it, and the others apply the same rule.

Story Pole Certification California, Three Patterns Worth Knowing

Who signs, and why the town cares

The point of certification is that somebody with a licence has put their name to the claim that the poles match the approved plan. A planner cannot measure a 28-foot ridge from the sidewalk, and a neighbour objecting at the hearing cannot either. The signed document is what lets the board treat the silhouette as evidence rather than as an approximation.

That is also why no town on this list lets the owner or the applicant sign. The stricter jurisdictions go further and name a licensed land surveyor or a surveying civil engineer specifically, because setting a pole top to a stated elevation is survey work measured from a benchmark, not a tape measure from the ground.

Deadlines follow the same logic. Where a town wants the certification before the notice is mailed, as Malibu and Burbank do, the poles are not considered installed until the document arrives. Where it is due within days of installation, as in Hillsborough, the intent is that nobody adjusts the poles afterwards.

What the document itself looks like

There is no statewide form. Monte Sereno and Malibu publish their own, which the surveyor completes and signs. Hillsborough, Mill Valley and Los Gatos accept a letter on the surveyor’s letterhead referencing the approved plan and the benchmark used. Calabasas and Tiburon will take a stamp and signature applied directly to the approved story pole plan. All three formats say the same thing, that the poles as built match the plan as approved, and the planning department files whichever one the policy names.

How we handle it

We coordinate a licensed land surveyor on every certified installation, which satisfies all 13 jurisdictions above, and we schedule the survey for the day after the install so the letter, form or stamped plan is ready inside the town’s window. Where you already have a project surveyor, we coordinate with them instead. Story pole certification. The full requirement set for each town, beyond certification, is in our town-by-town guide.

Send the plan set and address to hello@AllAmericanStoryPoles.com, or call or text (650) 613-1721 (Northern California) or (310) 980-2543 (Southern California).

Frequently asked questions

No. Most towns with a story pole policy do, but Los Altos Hills relies on staff inspection and photographs, Malibu requires it only for certain project types, and HOAs set their own rules.

Malibu, Burbank, Tiburon, Santa Barbara City and County, and Calabasas. Hillsborough explicitly does not; Mill Valley, Monte Sereno, Laguna Beach and Los Gatos require a surveyor or a surveying civil engineer.

Typically the project address and permit number, the plan date, the survey date, the benchmark and its elevation, the grade below the highest roof point and the highest roof elevation, and the licensed professional’s statement, stamp and signature. Monte Sereno’s form is a good example.

The hearing is continued, in every town on this list, and in Malibu, Burbank and Los Gatos the notice is not even mailed until certification is complete.

Story pole requirements are set by each city, town, county or review board and change from time to time. This table reflects published policies as of September 2026. Confirm current requirements with the planning department before your submittal.