Story Pole Requirements in California by Jurisdiction

Compare published story pole requirements for 14 California jurisdictions, with direct links to each official source.

Sources reviewed September 2026. Always confirm current, project-specific instructions with the assigned reviewer in your City, Town, County, HOA, Architectural review board or Planning Department.

California does not use one universal story pole standard. The reviewing authority determines whether poles are required for a project, if a story pole plan is required, installation material requirements, who may certify the installation, when the poles must be in place and when the poles may be removed.

This guide summarizes published requirements for the jurisdictions in our common service areas. It is planning information, not an approval or substitute for instructions from the assigned reviewer. For help with a project, see story pole plans, installation and certification coordination.

Northern California
Southern California

Compare Requirements by Jurisdiction

Use the official source linked to each entry and confirm the instructions that apply to your address. The Los Angeles entry covers Pacific Palisades; it does not represent a separate municipal policy.

Jurisdiction

Reviewing Body

Policy Requirements

Timing

Certification

String Lines and Markings

Removal

Official Source

Reviewing Body

Architecture and Design Review Board

Policy Requirements

Projects 22 ft or taller, new two-story houses and second-story additions, subject to published exceptions

Timing

Generally no later than 10 business days before the ADRB meeting

Certification

Licensed surveyor or civil engineer; approved plan attached; project architect not accepted

String Lines and Markings

Alternating black-and-white pole markings; contrasting woven-plastic netting at least 12 in wide

Removal

Through the 15-day appeal period; remove within the published post-action window

Official Source
Reviewing Body

Planning staff, Planning Commission or City Council

Policy Requirements

New buildings and specified additions, accessory structures and site features; 2025 policy includes stated exemptions

Timing

Before public notice and at least 10 days before the hearing

Certification

Project surveyor or civil engineer establishes perimeter points; applicant submits photographs; staff inspects

String Lines and Markings

Rigid poles; 2-ft orange snow fencing; plastic piping not accepted

Removal

After hearing and applicable appeal review, as directed

Official Source
Reviewing Body

Planning Commission and City Council

Policy Requirements

Specified multi-story commercial, multiple-family, mixed-use and public-facility projects; single-family design review uses a site notice instead

Timing

At least 20 days before the first public hearing

Certification

The reviewed source does not establish one universal certification rule; confirm with the assigned planner

String Lines and Markings

Per project instructions

Removal

Confirm for the application

Official Source
Reviewing Body

Planning Division and applicable reviewing body

Policy Requirements

Specified residential, hillside, historic-resource and nonresidential projects, including variances or exceptions

Timing

Before neighborhood notification

Certification

Licensed surveyor or civil engineer provides written verification

String Lines and Markings

Orange snow fencing at least 2 ft wide or double-row orange flagging; published pole markings

Removal

Until 60 days after first hearing or final appeal period, whichever is first

Official Source
Reviewing Body

Site and Architectural Commission

Policy Requirements

Second-story additions; new structures over 500 sq ft; additions over 500 sq ft

Timing

By 9:00 a.m. two weeks before the meeting

Certification

Use the current City certification form and confirm the accepted signer with Planning

String Lines and Markings

Orange snow fencing at least 2 ft wide; differentiated footprint and floor-level ribbon

Removal

City materials contain differing post-decision timing; confirm with Planning

Official Source
Reviewing Body

Planning Commission or Zoning Administrator

Policy Requirements

Design-review projects that substantially change the roofline

Timing

At least 10 days before the hearing

Certification

Licensed land surveyor

String Lines and Markings

Bright netting or heavy-duty tape at required wall and roof points; no caution tape

Removal

Immediately after the 10-day appeal period

Official Source
Reviewing Body

Design Review Board or Planning Division

Policy Requirements

Every design-review application; may be requested for other design-review or variance projects

Timing

At least 14 calendar days before hearing; photographs at least 10 days before

Certification

Accepted licensed professional carries out or certifies installation

String Lines and Markings

Bright construction tape or netting showing major plate heights and ridgelines

Removal

Through the 10-business-day appeal period; no later than 14 business days after final action

Official Source
Reviewing Body

Community Development Director or designee

Policy Requirements

New construction and additions subject to a Hillside Development Permit in the designated R-1 hillside area

Timing

After applicable code review and before public noticing

Certification

Affidavit by licensed architect, engineer or surveyor; owner may not certify

String Lines and Markings

Black pole tops; bright orange mesh at least 24 in wide; flags, string or rope not accepted as netting

Removal

Through review and appeal; next business day after appeal period if no appeal

Official Source
Reviewing Body

Planning Commission

Policy Requirements

Specified overlay-zone, ridgeline, freestanding commercial, multi-family and height-exception projects

Timing

At least four weeks before hearing; certification at least three weeks before first hearing

Certification

Licensed contractor, surveyor, architect or civil engineer

String Lines and Markings

Bright orange mesh 1 ft wide; markings on tallest pole

Removal

Through final decision and any appeal; then remove within the published post-decision period

Official Source
Reviewing Body

Design Review Board, Planning Commission or Community Development Director

Policy Requirements

Projects subject to municipal-code design-review staking requirements

Timing

At least 21 calendar days before first public hearing; 14 days for administrative review

Certification

Registered land surveyor or civil engineer licensed to conduct land surveys

String Lines and Markings

Poles and connecting ribbons showing the full extent, including decks and eaves

Removal

Within 20 calendar days after final decision, subject to City instructions

Official Source
Reviewing Body

Planning Manager or Planning Commission

Policy Requirements

Coastal Development Permits and certain discretionary Administrative Plan Review requests; waiver may be possible

Timing

After departmental review and before hearing notice, or as specified for projects without a hearing

Certification

For identified project categories: licensed surveyor, civil engineer or architect; owner may not certify

String Lines and Markings

Black pole tops, height markings and bright orange construction mesh along roof and ridge lines

Removal

Within seven calendar days after final appeal period unless Planning approves otherwise

Official Source
Reviewing Body

Depends on parcel and reviewing body

Policy Requirements

No separate verified Pacific Palisades municipal story-pole policy; obtain instructions from the authority or committee reviewing the address

Timing

Per written project instructions

Certification

Per written project instructions

String Lines and Markings

Per written project instructions

Removal

Per written project instructions

Official Source
Reviewing Body

Planning bodies identified in the supplemental application

Policy Requirements

Specified nonresidential, mixed-use, multi-unit and single-unit projects; reviewing body may require visual aids in other circumstances

Timing

At least seven days before hearing; longer for major projects

Certification

Licensed professional accepted under the City’s supplemental application; signed certification letter

String Lines and Markings

Bright tape or netting showing a simplified mass and required site features

Removal

Generally through hearing; confirm appeals and removal with staff

Reviewing Body

County Boards of Architectural Review

Policy Requirements

Commonly requested case by case by the applicable Board; the Board may modify requirements

Timing

At least three days before the BAR meeting

Certification

Accepted licensed professional who prepared the plan or installed the poles

String Lines and Markings

Sturdy poles with 12-in orange snow or construction netting

Removal

Remain at least seven days after the meeting, subject to County direction

Official Source

What changes from one jurisdiction to another

Local policies differ in several ways: which projects require story poles, string line material and pole marking requirements, whether a professional must certify the installation, and how the hearing or notice schedule controls installation and removal deadlines.

Who may verify or certify the installation

Verification or certification of the story pole plan or installation is not universal. Some policies require a licensed engineer or surveyor to complete and sign a City form, story pole plan or certification letter certifying the accuracy of the installation. Others also accept an architect, contractor, landscape architect or other licensed professional. A few policies expressly prohibit owner certification or certification by someone with a financial interest.

American Story Poles provides installation and certification coordination. We work with a team of licensed professionals to perform the verification and issue the certification for each project. Read about certification coordination.

Installation and Certification Deadlines

Start with the hearing, public-notice or submittal date provided by the reviewing body. Installation deadlines range from a few days to several weeks, and require installations and certifications be complete before public hearings or Planning Commission meetings.

Each project schedule may include plan approval, staking or survey requirements, installation, photographs and certification. Treat the table as an early planning reference and use the reviewer’s written project instructions for deadline requirements. Review the installation workflow for more information on project organization and schedule.

Materials and markings requirements come from the policy

Published policies use different combinations of lumber, metal or other sturdy poles; mesh, netting, tape or flagging; height markings; footprint stakes; and site-specific features. Some authorities prohibit materials that others allow.

The approved plan and current project instructions should therefore define the installation material requirements. The written quote will note materials for installation, documentation and certification coordination, rather than assuming one standard specification.

Story Pole Requirements FAQs

No single statewide rule governs every project. Requirements are established by the applicable city, town, county, design-review body or private reviewing organization, and project-specific instructions may also apply.

No. Applicability depends on the jurisdiction, project type, location, height, scope and reviewing body’s decision. Some policies include exemptions or allow another visual aid.

Depending on the jurisdiction, it may be a licensed surveyor, civil engineer, architect, contractor, landscape architect or another accepted licensed professional. Confirm the signer with the review board.

Published timing in the jurisdictions summarized here ranges from a few days to several weeks before a hearing.

Removal depends on the reviewing authority’s final action, appeal rules and project instructions. Obtain authorization before requesting removal.

Talk With Our Team

Need Requirements Reviewed for a Project?

Send the project address, current plans, reviewing authority and deadline. We will review the available information and define the proposed scope in writing. You can also browse the California service areas.

Request a Quote

Start With Your
Project Details.

Municipal policies and project instructions can change. Sources on this page were reviewed in September 2026; Always confirm current, project-specific instructions with the assigned reviewer in your City, Town, County, HOA, Architectural review board or Planning Department.