What Neighbors Can (and Cannot) Tell From Story Poles

The short answer

Story poles next door mean someone is proposing a new building or an addition and the town wants you to see its real height, footprint and roof lines before a public hearing decides it. The poles and the orange lines show exactly that, meaning where the walls will stand, how high the ridges will rise, and how the mass will sit relative to your windows, yard and views. They do not show materials, colors, windows or landscaping. Here is how to read them and what happens next.

What Story Poles Next Door Actually Show

What the poles do not show

They are an outline, deliberately simplified. Most policies say so. Tiburon and Santa Barbara ask for “a simple box that outlines the mass,” not every articulation. So the poles will not show dormers, minor roof steps, window placement, exterior materials, color, or landscaping. The plans on file with the planning department show those; the hearing notice tells you where to see them.

How to read story poles and know they are accurate

In most towns the installation is certified. A licensed land surveyor (or, in some cities, an engineer, architect or contractor) inspects the poles against the approved story pole plan and signs a letter, a form or the plan itself. Owners may not certify their own poles. The planner often visits the site as well, and photographs from the street and from neighboring vantage points go into the file. If poles are inaccurate or missing, the hearing is continued until they are fixed. That rule exists to protect neighbors as much as applicants. How certification works.

How the hearing process works from the neighbor's side

A note on what accurate poles do for everyone

Story poles exist so the hearing is about the real project, not about competing descriptions of it. An accurate installation shows a neighbor exactly what will change, which sometimes reassures and sometimes raises a legitimate concern the board can address. A sloppy installation does neither; it creates arguments about the poles instead of the building. That is why we install to the approved plan, brace the poles to stay true through the review, photograph them, and coordinate certification where the town requires it. How our installations work. For the full definition see What are story poles?, and for every town’s rules see the requirements guide.

If the poles next door look wrong

Story poles are only useful if they are accurate, and an inaccurate set is grounds for comment at the hearing. If the outline does not match the plans on file, say so to the case planner named on the notice. They can ask for the poles to be corrected or the hearing continued. Applicants reading this from the other side can reach All American Story Poles at hello@AllAmericanStoryPoles.com, or on (310) 980-2543 in Southern California and (650) 613-1721 in Northern California, and we will tell you what your town requires before anything goes up. Contact us.

Frequently asked questions

A new building or addition has been proposed on that lot and the town requires a full-scale outline on site before a public hearing. The poles show the corners and the orange lines show the roof ridges and eaves at the proposed height.

In most towns a licensed surveyor certifies that the poles match the approved plan, and the planner checks. Several towns mark the poles (stripes, black tops, foot increments) so heights can be read by eye. If you believe they are wrong, tell the planning department before the hearing.

Yes. The plans are on file with the planning department, and the hearing notice says where to view them. Many towns require the story pole plan to be available at the site as well.

Through the hearing and the appeal period, then they must be removed within the town’s deadline, from 48 hours to several weeks after the decision.

Story pole requirements are set by each city, town, county or review board and change from time to time. Town details in this guide reflect published policies as of September 2026. Confirm current requirements with the planning department.