Staking Plan vs. Silhouette Plan vs. Story Pole Plan

The short answer

In California design review, a staking plan, a silhouette plan, a story pole plan, a temporary framing plan and a height pole and netting plan are all the same document. It is a simplified roof plan showing where each temporary pole goes, how high it must reach, and which poles are connected by string line to trace the ridges and eaves of a proposed building. The name depends on the town. (This is a construction and planning term; it has nothing to do with staking cryptocurrency or a stakeholder plan.)

What a Staking Plan Contains, Whatever the Town Calls It

Good ones simplify. Tiburon and Santa Barbara both describe the goal as a simple box that outlines the mass of the building, not every articulation.

Who calls it what

TermWhere it is usedNotes
Story pole planHillsborough, Mill Valley, Burbank, Malibu, Calabasas, Santa Barbara, most townsHillsborough wants it as an 8.5 x 11 copy of the roof plan on the site plan; Burbank as 11 x 17 plus PDF with poles in red; Malibu on a reduction of the roof plan at the same scale
Staking planLaguna BeachThe municipal code calls the whole process “staking”: the staking plan is prepared per the current submittal checklist and the poles are “staking poles” (LBMC 25.05.040)
Silhouette planSouthern California HOAs; Burbank describes poles as “silhouette structures”Common in HOA architectural guidelines in Pacific Palisades, the Palos Verdes Peninsula and coastal Orange County
Temporary framing planBay Area towns and installersUsed by our company for the same drawing
Height pole and netting plan / Story Pole PlanLos Gatos, Los Altos Hills, Monte SerenoLos Gatos calls the poles “height poles” and the drawing a “Story Pole Plan,” optional but recommended, approved by the project planner before placement (Town of Los Gatos, policy PDF)

Why the name matters anyway

Two reasons. First, the planner recognises the sheet by the town’s own term, so titling it “Staking Plan” in Laguna Beach or “Story Pole Plan” in Hillsborough removes a question at intake. Second, each term comes with its town’s format rules, and those are what get a plan rejected, whether that is the wrong sheet size, no table of elevations (Mill Valley), missing plan notes (Malibu), missing license number (Calabasas), or color where black and white is required (Hillsborough). We keep every town’s current checklist and draft to it. How we draft story pole plans.

Three examples

From the drawing to the site

Whatever it is called, the plan is what the crew installs to and what the surveyor certifies against. When we draft it, the field work matches the sheet; when your architect drafts it, we install to theirs. Either way the installation follows the plan the town approved. Our requirements guide lists the plan format each town expects.

Send the plan set and address to hello@AllAmericanStoryPoles.com, or call or text (650) 613-1721 (Northern California) or (310) 980-2543 (Southern California). Most story pole plans go back within 1 to 2 business days.

Frequently asked questions

In California design review, a staking plan is the drawing that shows where temporary staking poles go, how high they reach and how they connect to outline a proposed building on site. Laguna Beach uses the term in its municipal code; other towns call the same drawing a story pole plan or silhouette plan.

Yes. Silhouette is the term many Southern California cities and HOAs use for story poles, and the silhouette plan is the same drawing of pole locations, heights and connections.

The applicant’s architect, engineer or designer, or a story pole company like ours. Some towns (Los Gatos) make the plan optional but recommend it; most require it before installation and approve it first.

It depends on the town: 8.5 x 11 in Hillsborough and Malibu (as a reduction of the roof plan), 11 x 17 plus a PDF in Burbank, the full-size roof plan in Laguna Beach. We draft to the town’s format.

Story pole requirements are set by each city, town, county or review board and change from time to time. Town details in this guide reflect published policies as of September 2026. Confirm current requirements with the planning department before your submittal.